A day-by-day account of the activities of the Rossnaree Archaeological Project 2010-11

Day 19 – It is all becoming clear now…

First of all, the piece that RTE came to the site to film was aired on the 6-One News and the 9 O’Clock News on RTE1 last night. It is amazing how much time was spent on-site and how much footage was shot to make up the final piece. I think the point was well made, however and thanks to Chris in the Institute of Archaeologists of Ireland (IAI)  for setting up the piece and to Philip Bromwell for his interest and patience. For those who didn’t see the piece, the link is:

http://www.rte.ie/news/av/2011/0727/media-3012820.html
Cut 8 cleared at last!

Anyway, back to business at Rossnaree. There was prolonged rain overnight which thankfully had cleared by morning. This moisture did wonders in each of the cuttings because suddenly there was, once again, some colour in the soils. Instead of a continuous hard-packed dusty pale yellow surface like concrete, we could see all shades of brown, orange, yellow and even red. At last we had some clarity and we able to distinguish between the last skims of ploughsoil and the undisturbed natural. If only this had happened a week ago it would have been much more helpful, especially in Cuttings 7 and 8 where had such difficulty. That’s the way the breaks come – all real discoveries inevitably seem to come in the final week of the dig (remember what happened last year!) or, worse in the last day or two.

Sieezing the opportunity presented by the conditions, Darren, Sophie and Ciara trowelled over the surface of Cutting 8 one last time to reveal a number of disturbed areas which are probably the remains of additional graves in the cemetery. At this late stage of the dig it is not feasible to excavate further but we at least have been able to identify and record the location accurately. All of the new detail was added to a plan of the cutting later on that afternoon.

Kieran to the rescue!
Matt planning again.

In Cutting 7 we were joined by Rossnaree veteran Kieran Campbell who was a member of the team from last season. Kieran very kindly offered to help out in the last few days of the dig – exactly the time when he is needed most. Kieran undertook to lift the skeleton in Burial 2 along with Matt. Mags recorded a number of the features that Matt had previously examined in the cutting by drawing sections and profiles of them. Matt later finished drawing the post-excavation plan of the cutting and he added the detail of the grave cuts. When this was done he drew up the southern section face of the cutting showing the depth of ploughsoil and the various levels within it. Kevin was also on hand again today and using a total station he accurately recorded the positions of the control points we had installed around Burial 2. He also surveyed in the location and shape of each of the grave cuts of Burials 1 and 2.

In Cutting 6 Eimear carried out post-excavation plans of the two completed sections and also drew up the profiles of the sides of the cuttings. Niamh continued to excavate a section through the oval enclosure ditch and this is turning out to be quite a substantial feature. It is a lot deeper and wider than we had anticipated but she has found the edges on either side as well as the base. Very good work for one day.

Tomorrow, we will finish the last of the recording and then start the backfilling. I’ll let you know how we get on.

Nearly there…