A day-by-day account of the activities of the Rossnaree Archaeological Project 2010-11

Day 11 – A new week.

Igor tests his trowel.

We’re over the half-way mark now and beginning to think about making sure we are able to finish everything we start in the time available. We were joined by a new person this morning for a few days – Igor – who was involved in the geophysical surveys of each of the areas immediately prior to the start of the excavation. While Igor now works mainly in geophysical surveying, he has spent time on a number of the Celtic Tiger road schemes and his experience is welcome.

.

Matt and the ‘mystery feature’.

The weather over the week-end had been quite mixed with a lot of showers. This was good for the site because when we arrived down and took a closer look at the cuttings, the additional moisture in the soil has made it a bit easier to see the differences in the colours and textures of the soils making up the fills of features. In Area 2 Matt continued to examine features that were identified and planned last week. He did this by half-sectioning them. This is where half of the feature is excavated using a trowel or a leaf trowel to find the exact extent and the cut and base of the feature before excavating and removing the second half. This usually means that the excavation of the second half of the feature is more accurate and ensures that any soil samples, which are only taken at this stage, are less likely to be contaminated with other soils. These soil samples can later be processed to identify macrofossil remains, i.e., fragments of vegetation etc. which, in turn, can tell us about the environment around the site at the time the feature was in use.

Most of the features that we had identified turned out to be less than exciting. Many seem to be pockets of soil that had accumulated in deeper-than-usual hollows left in the subsoil where large cobbles were disturbed by ploughing. However, there is one area where there may be a substantial feature containing a number of fragments of bone. We have labelled this Feature 714 and we will take a closer look tomorrow before coming to any conclusions. I’ll keep you posted.

Darren ‘The Machine’!
Sophie on the sieve (again!).

Darren and Sophie continued to take down the ploughsoil in Cutting 8 and this was almost completed by finishing up time after a burst of very robust mattocking by Igor. Once the cutting clear, we will work it back again to find the base of ploughsoil in the same way as we did in the other cuttings. However, this process should be a lot quicker this time because we have a very good feel for what the local subsoil looks like and at what depth we should expect to find it.

Eimear’s the boss!
Area 1: ‘you could eat your dinner off it!’

.

.

.

.

.

.

.

In Area 1 the cleanback continued in preparation for photographs and planning. The whole surface of the cutting had to be troweled over lightly again because a certain amount of dust and other debris had blown in over the week-end and the rain had made the surface less clear and distinct. Eimear was in charge and by the afternoon, the photos were taken and the planning could begin.