A day-by-day account of the activities of the Rossnaree Archaeological Project 2010-11

Day 20: The longest day

Rossnaree excavtion Trench 3

Trench 3 fully filled...at last!

Once again, I am reduced to beginning a post by talking about the weather. Today was the last day of the dig and a lot of hard work lay in store for the small but elite group of diggers remaining on site. If desodding is regarded as an unpleasant job, backfilling is much more difficult and demoralising. To make matters worse, the weather was not kind to us today, making the job much more arduous. It started off drizzly, stopped for a while, started again, and so on until about three o’clock. Although we had completely backfilled Trench 4 already, there were still two, Trenches 1 and 3,  to backfill. These were going to be tougher than 4 because they were situated on a slope.

Rossnaree excavation Trench 3

Trench 3 spoilheap disappears

Because of the topography immediately around these trenches, there was no option at the beginning of the excavation but to place the spoilheaps for each of them downslope of the trenches. This meant that every bucketful of spoil dug out of each of these trenches had to be shovelled into wheelbarrows and barrowed back uphill. At Trench 3, this meant that a zig-zag route was required, lengthening each journey across the slippery slope surface. In spite of the challenging conditions, we eventually reached our goal and completely filled the trench.

Rossnaree excavation Trench 1

The Trench 1 spoilheap

Rossnaree excavation Trench 1

The team gets to work on Trench 1

.

.

.

.

.

.

Then we moved on to Trench 4. A ‘closing deposit’ had been created on the top of the spoilheap by Clíodhna (age 6!), perhaps to appease the spirits of the place and atone for the disturbance that they had to endure over the previous four weeks. We worked until six, when we were fit to drop and a big thank you goes to all of the team who pitched in on this dreaded day lightening the workload with cheery conversation (and even some song!).

A big thank you goes to all who assisted with the excavation. Many people worked on the site over the few weeks, some longer than others. All time spent on the site helped and is greatly apprecated.

Rossnaree excavation Trench 1

The Trench 1 'closing deposit'

So to Matt, Kieran, Darren, Eimear, Niamh, Deirdre, Eamonn, Andrew, Valerie, Mark, Ailbhe, Michael, Gary, Jessica, Carol, Kim and Louise a very big thank-you. Thanks to Kevin and Mark for the surveying and the support and encouragement. To Paschal, thanks for facilitating our access to the field, to Fin and Steve for lending us the equipment we needed and helping with the logistics, to Niamh for the scones, to our visitors who took the time to come and see what was going on and also give their support, both moral and practical. And finally, to Aisling, many many thanks for allowing us access to one of the most enchanted corners of this island for the month.

Because the sitework is now finished, there will be no more day-by-day posts. However, we hope to do some additional ‘tidying up’ survey work soon in order to try to identify the presence of potential prehistoric features and I will post the progress and results of that work. Also, the post-excavation work will now commence, but as much of this will require additional funding which will hopefully be provided at a later stage, and there will be occasional posts on this as the work is done. Thanks to everyone who took the time to check out the blog; many of the comments came from people who are not known to me and who seem not to be archaeologists but who, nonetheless, found the blog interesting and informative.

Advertisements

Comments are closed.